Bridge the gap between installation and operation.

AEGIS commissioning support is field-focused: verify the installation, establish the operating baseline, prove functional behavior, document deficiencies, and support a cleaner turnover.

Equipment + Installation + Controls + Operation
Field Sequence

A disciplined startup is more than turning equipment on.

The exact scope depends on the equipment, project documents, OEM requirements, and the responsibilities assigned to AEGIS.

01

Pre-Startup Verification

Confirm installation readiness, service access, obvious deficiencies, electrical readiness, and required preconditions.

02

Equipment Startup

Support initial operation, establish baseline conditions, and capture critical operating data.

03

Functional Testing

Verify modes, staging, safeties, transitions, and expected responses within the assigned scope.

04

Turnover & Closeout

Document deficiencies, verify corrections where assigned, and leave the project with a clearer operational record.

What We Verify

Commission the system, not just the box.

Depending on the project, AEGIS may evaluate electrical conditions, refrigeration behavior, airflow, control sequences, installation details, safeties, alarms, staging, and the handoff between equipment and controls.

Controls Verification

Confirm commanded operation, sequence intent, sensor behavior, staging, and obvious control conflicts within scope.

Refrigeration Verification

Evaluate operating conditions and refrigerant-circuit behavior using applicable OEM information and measured data.

Airflow Verification

Review evidence of proper air movement and system response where airflow is part of the assigned work.

Deficiency Documentation

Record what is observed, what has been proven, and what requires correction or additional investigation.

Commercial rooftop HVAC unit being positioned by crane
Commissioning begins before the first run command. Installation readiness matters.

Scope Boundary

AEGIS commissioning and technical support do not replace licensed engineering, design responsibility, code authority, or OEM requirements unless those responsibilities are separately contracted and legally applicable. Project-specific deliverables are defined before work begins.

Commissioning Support

Start cleaner. Turn over stronger.

Use the technical-support intake to provide project, equipment, controls, and startup details before the field visit.